CASE STUDY
Water Treatment Facility Employs Premcote 101™ Tape System
Buried Coatings
Project Data
Location | Ha Tinh Province, Vietnam |
Agent | Minh Phuc |
Contractor | Hoang Duong Co. Ltd. |
Products | Premcote™ Primer and Premcote 101™ Tape |
Date | May 2017 |
Project Details
At the Wastewater Treatment Facility at the Formosa Plant in Ha Tinh Province, Vietnam, Premcote 101™ Tape has been used for the protection of buried pipework.
The Premcote 101 Tape System involves applying a basecoat of Premcote™ Primer to the pipe to prepare it for the application of the Premcote 101™ Tape. The use of the dedicated primer for the Premcote 101 Tape System allows for excellent adhesion of the tape to the pipe.
The Premcote 101 Tape System was recommended by Minh Phuc. The works were carried out by Hoang Duong Co. Ltd and were completed in May 2017.